F.No.1(9)/2004-General

Government of India

Ministry of Parliamentary Affairs

 90, Parliament House,

New Delhi.

 

Dt: 22 Feb., 2006 

NOTICE

Subject:- Contract regarding repairing of staff cars and three-wheeler scooters of the Ministry of Parliamentary Affairs.

 ----

 

            It is informed on the above mentioned subject that a contract is to be given regarding maintenance, servicing/ over hauling and repairing of other technical faults of  7 Ambassador cars and 1 three-wheeler scooter (Bajaj) of this Ministry. Details of the technical faults which are to be repaired generally are given in the enclosed list.  

 

            You are therefore requested to send your quotation regarding labour charges for repairing work as per enclosed list/cost of parts to the address mentioned below in a sealed envelop latest by 10-3-2006:

 

Shri K.K. Thakur, Deputy Secretary, Ministry of Parliamentary Affairs, 86-B, Parliament House, New Delhi-110001.

  

Note:  Kindly write the word “Secret”quotation while sending the typed quotation.

  

(DHARAM PAL)

UNDER SECRETARY, GOVERNMENT OF INDIA

Tele No: 23034274

To,

Manager,

___________________

___________________

 

 

 

NATURE OF WORKS

Servicing and lubrication (Monoling Programming System)

ENGINE

 

Rate of Parts

Rate of Labour charges

1.     

Overhauling of complete Engine

 

 

2.     

Cylinder head overhauling

 

 

3.     

Change of fly wheel ring

 

 

4.     

Rocher shaft and tappet replacement

 

 

5.     

Adjustment and refitting of oil pressure relief

 

 

6.     

Replacement of timing cover plate

 

 

7.     

Refitting of oil samp

 

 

8.     

Engine tuning tappet adjustment distributor & GB point, spark plugs cleaning & adjustment

 

 

9.     

Overhauling of fuel pump

 

 

10.  

Replacement of valve guide

 

 

11.  

Replacement of Accelerator wire

 

 

12.  

Adjustment of tapost oly

 

 

13.  

Cleaning of distributor

 

 

14.  

Cleaning of Carburetrtor

 

 

15.  

Cleaning and replacement of sparking plugs

 

 

16.  

Replacement of Dist Cap

 

 

17.  

Refitting of connecting rod bearing

 

 

18.  

Replacement of main bearings

 

 

19.  

Replacement of fan belt

 

 

20.  

Replacement of timing cover packing

 

 

21.  

Replacement of New timing chain

 

 

22.  

Overhauling of water pump bearings

 

 

23.  

Replacement of water pump assembly

 

 

 

CLUTCH

 

1

Overhauling of clutch

 

 

2

Adjustment of free travel of clutch

 

 

3

Replacement of clutch brakes paddle shafts/bushes

 

 

4

Overhaul of clutch plate assembly

 

 

5

Replacement of clutch adjusting rod

 

 

6

Clutch plate relining

 

 

 

GEAR BOX

 

1

Overhauling of Gear Box

 

 

2

Replacement of front oil seal 

 

 

3

Replacement of side cover packing & seal 

 

 

4

Replacement of gear box foundation

 

 

5

Replacement of gear lever

 

 

6

Replacement of gear linkage ball joint

 

 

 

STEERING

1

Overhauling of complete steering

 

 

2

Removal and refitting of steering assembly

 

 

3

Adjustment of bell joint

 

 

4

 Adjustment of rod ends

 

 

5

Adjustment of damper pad

 

 

6

Adjustment of pinion thrust 

 

 

7

Adjustment of pinion bearing 

 

 

8

Adjustment of flange 

 

 

9

Replacement of top melt of steering

 

 

10

Replacement of  bottom melt of steering wheel

 

 

11

Replacement of   steering wheel

 

 

12

Replacement of steering column

 

 

13

Replacement of Gear control

 

 

14

Replacement of Gear control vid assembly

 

 

15

Replacement of gear control rod support   assembly  Pivotpin selector lever new making

 

 

16

Replacement of  gear pivol bracket

 

 

17

Replacement of  tie rod ends (each)

 

 

18

Replacement of  ball joint (each)

 

 

19

Replacement of bracket column support assembly 

 

 

20

Setting of wheel caste chamber & toe-in-out

 

 

21

Adjustment of toe-out and toe-in

 

 

 

SUSPENSION

1

Overhauling of complete suspension

 

 

2

Replacement of rubber bushket

 

 

3

Replacement of rear spring assembly (one side)

 

 

4

Replacement of broken leaf

 

 

5

Replacement of tie bar bush (one side)

 

 

6

Replacement of one shock absorber

 

 

7

Replacement of rear spring bushes

 

 

8

Replacement of front wheel oil seal

 

 

9

Replacement of tors on bar

 

 

10

Replacement of  rear spring re-cambing

 

 

11

Replacement of   front suspension bush

 

 

 

PROPELLER SHAFT

1

Fitting of new propeller shaft

 

 

2

Fitting of propeller shaft ‘U’ joints 

 

 

 

REAR AXLE

1

Refitting of real axle assembly, including blading and adjusting brakes

 

 

2

Overhauling of differential, dismantling, rear axle fitting with new parts

 

 

3

Replacement of bul oil seal

 

 

4

Replacement of bub bearings

 

 

5

Replacement of pinion oil seal

 

 

6

Replacement of rear axle shaft

 

 

7

Replacement of differencial packings

 

 

8

Replacement of rear brake drum

 

 

9

Replacement of backplats assembly from the axle casing flage

 

 

 

BRAKES

1

Overhauling of complete brake system

 

 

2

Adjustment of foot brake shoe

 

 

3

Adjustment of brakes bleeding system

 

 

4

 Overhauling of Master cylinder

 

 

5

Replacement of front brake linings

 

 

6

Replacement of wheel cylinder one side 

 

 

7

Overhauling of all the wheel cylinder 

 

 

8

Replacement of complete brake lining 

 

 

9

Replacement of rear brake linings   

 

 

10

Replacement of  brake drum linings 

 

 

11

Replacement of   hand brake cable

 

 

12

Replacement of brake hose & bleeding

 

 

13

Replacement of breake drum front

 

 

14

Replacement of front brake drum bearing and adjustment

 

 

 

ELECTRICALS

 

1

Dynamo overhauling 

 

 

2

Dynamo assembly replacement

 

 

3

Replacement of dynamo pully

 

 

4

Replacement of dynamo fan

 

 

5

Testing and recharging battery

 

 

6

Replacement of voltage regulator 

 

 

7

Overhauling of self starter 

 

 

8

Repair of horn   

 

 

9

Replacement of head light bulb each   

 

 

10

Replacement of  side and tail light bulbs 

 

 

11

Replacement of close light bulb

 

 

12

Overhaul of horn bips

 

 

13

Replacement of horn ring starter plate sleeve

 

 

14

Replacement of complete wiring

 

 

15

Replacement of ignition switch

 

 

16

Replacement of fuel guage tank unit

 

 

17

Replacement and checking of fuel gauge desh board

 

 

18

Fitting of new search light

 

 

19

Fitting of new electric bulb in parallel

 

 

20

Fitting of speedometer cable assembly

 

 

21

Replacement of Ammetor

 

 

22

Replacement of self starter switch

 

 

23

Replacement of solonised switch

 

 

24

Replacement and Checking of wiper blade (each)

 

 

EXHAUST

1

Replacement of Exhaust pipe front

 

 

2

Replacement of new muffler

 

 

3

Repairing muffler assembly, buffer plates

 

 

4

Replacement of tail plate

 

 

5

Replacement of silencer pipe bracket (each) 

 

 

6

Realigning exhaust pipe assembly   

 

 

BODY

1

Removing & replacing rear back light glass

 

 

2

Replacement of front wind screen glass 

 

 

3

Removing & replacing of door lock (one side) 

 

 

4

Removing & replacing of external door handle 

 

 

5

Replacing the door hinges pin of each door

 

 

6

Replacement the door window regulator 

 

 

7

Replacement of door glass (each) 

 

 

8

Replacement of door gola

 

 

9

Replacement of door beeding set  

 

 

10

Replacement of  door channel set 

 

 

11

Replacement of   door handle set 

 

 

12

Replacement of channel set of beeding set 

 

 

13

Replacement of roof upholstery

 

 

14

Bonnet adjustment 

 

 

15

Repairing and replacement of dicky 

 

 

16

Replacement of  front and rear bumper 

 

 

 

PAINTING

1

Complete painting double coat without dent 

 

 

2

Complete painting single coat   

 

 

3

Complete painting after scrapping old paint   

 

 

4

Complete painting after colour change   

 

 

 

A/c Serving and gas refilling.

 

Rates for repair of three wheeler  

 

 

NATURE OF WORKS

Servicing and lubrication

 

Rate of Parts

Rate of Labour charges

1

Engine overhauling 

 

 

2

Brake overhauling 

 

 

3

Clutch plate replacement   

 

 

4

Gerar box overhauling 

 

 

5

Brake shoe replacement

 

 

6

Clutch wire replacement 

 

 

7

Clutch adjustment   

 

 

8

Brake adjustment  

 

 

9

Kick replacement

 

 

10

Front and rear shocker replacement

 

 

11

Gear wire replacement

 

 

12

Complete paint single cot 

 

 

13

Complete paint double coat 

 

 

 

Labour charges for other misc. and small jobs including electrical jobs will vary from Rs. ______ to Rs. ______ only.